The Lucknow Metro is an under construction rapid transit system in the city of Lucknow, India. Construction on the first phase began on 27 September 2014.〔 Lucknow Metro Rail Corporation Limited or LMRC is responsible to build and operate this network. The metro project will be the most expensive public transport system in the state of Uttar Pradesh, costing in phase 1 of construction which is expected to be operational in 2018.Phase 2 will be started in 2018. Lucknow being the metro city in Uttar Pradesh and the largest city of north and central India after Delhi and has urban population about more than 5 million in 2015. The government decided to build a metro rail system in the state capital. It will provide speedy mass transport and help in reduce traffic congestion on city roads.〔〔 The proposed metro rail network was planned to consist of two corridors: North-South and East-West one from Amausi to Munshi Pulia and other from Vasant Kunj to Charbagh Railway Station. Both lines will intersect at Charbagh. An extension line from Indira Nagar – Gomti Nagar – Polytechnic Crossing will extend it to Patrakarpuram, Gomti Nagar. The difference between arrival time of trains at each station is expected to be 7 minutes. This would be reduced to 5 minutes and then to 3 minutes in phases.The work would be finished by 2017 of first phase. ==History== Initially the Lucknow Metro Rail Project was planned to include two corridors: North-South and East-West; and the Gomti Nagar link. The construction cost was estimated at Rs74.13 billion for North-South corridor, Rs48.79 billion for East-West corridor and Rs4.95 billion for Gomti Nagar link. The North-South corridor was to connect Amausi airport to Munshipulia and cover a distance of 23 km, including 14.87 km elevated, 1 km ramp and 7.2 km underground. This corridor will have a total 22 stations including 18 overhead and 4 underground. The elevated stations would have included the Airport terminal, Amausi, Transport Nagar, Krishna Nagar, Singaar Nagar, Alambagh, Alambagh ISBT. This shall be followed by an underground section that will include Hussain Ganj, Sachivalaya (Uttar Pradesh Secretariat), Hazratganj, KD Singh Babu Stadium. Here after, the track will be elevated again, stations in the sequence are Dalibagh crossing, Lucknow University, IT College, Mahanagar, Badshahnagar, Lekhraj Market, Ramsagar Mishra Nagar, Indira Nagar and a new terminus Munshi Pulia. For the Gomti Nagar link, the train coming from the airport terminal was to be diverted towards Gomti Nagar at the Indira Nagar trisection Polytechnic crossing along an elevated route. The planned stations were Indira Nagar Trisection, West End Mall (Multiplex ), Gomti Nagar & Patrakarpuram. The East-West corridor was planned to connect the Lucknow railway station at Charbagh to Vasantkunj on Hardoi Road and have a total length of 11 km, including 4.29 km elevated, 0.5 km ramp and 6.3 km underground. This corridor was to have 12 stations including seven underground and five overhead. The stations at Lucknow Railway Station (Charbagh), Gautam Buddha Marg, Aminabad, Pandeyganj, Chattrapati Shahuji Maharaj Medical University (King George Medical University) and Niwazganj were to be below ground level, and an elevated section for the Thakurganj, Balaganj, Sarfarazganj, Moosabagh and the Vasant Kunj terminal stations. The designed speed of metro would be 80 km/hr while the scheduled speed would be 34 km/ hr for North-South corridor and 32 km/hr for East-West corridor. There would be only one depot at Vasant Kunj spread over a land measuring 20 hectares. The Amausi Depot has been done away because of its proximity to the Airport and the subsequent reasons of security and safety.〔(【引用サイトリンク】title=Lucknow metro rail makes a turn towards Gomtinagar )〕 In 2013, the Department of Urban Planning did away with the two-corridor layout and recommended a dense network of metro connectivity in Lucknow. The entire route has been proposed to be built overhead. Due to this, the overall cost of the project will go up due to an expanded network, the operating cost per km will be reduced. This is because the cost of constructing one km of overhead track is as compared to for an underground track. Also, an underground track consumes much more energy and is less safe. There is also a proposal to start a Bus Rapid Transit System (BRTS) as a feeder service to the metro. 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Lucknow Metro」の詳細全文を読む スポンサード リンク
|